So way back on June 25th I saw that the wax ring on the upstairs (guest room) toilet was leaking and knew it needed to be replaced. I thought it would be a quick and fairly easy job.
Ha! I was so wrong.
I had the toilet out and was debating whether or not to replace the floor at the same time. The floor still looked good, but was getting older and it seemed to make sense to not put the toilet back in until I was sure the flooring was good for a few more years.
So I peaked underneath… (Yes, that is the original 1970’s linoleum under the vinyl plank flooring… that bathroom was a time capsule.)
…and found a mess of wet subfloor! (Thankfully it ended up being clean water from the valve, not dirty from the toilet!)
Which led, of course to tearing all the flooring up, letting the subfloor dry, adding another layer of 1/4” plywood on top to reinforce the damaged subfloor, and finally a new floor.
(Are we having fun yet?)
And while I was at it, we replaced the vanity too since that bathroom still had the original 1970’s era vanity, removed an old non-functioning baseboard heater, patched and repaired a bunch of drywall, and replaced the baseboards and door moulding. One thing definitely led to another with this job!
It took five weeks (about half of that was plumbing, Joe isn’t the quickest plumber 😂) but it’s done, and I’m happy with it. I repainted it with the same colors since I really liked this “blue sky” bathroom.
I’m so glad it’s done… unfortunately it’s the kid’s bathroom that really needs a redo…but I don’t have the energy for that just yet.